News

Nordex to install 62.7 MW wind farm in the Netherlands

Location:
29th May 2014  To: 29th May 2014

Nordex will deliver its Generation Delta N100/3300 turbines to the site and begin installation this autumn. It will be the first time the turbines will be used in the Netherlands.

The 62.7MW project is due to be connected to the grid by March 2015, and the turbines will be covered by a 15-year service agreement from Nordex.

Delfzijl-Noord is located near the coastal town of Delfzijl, an area with characteristically high winds. The German manufacturer's N100/3300 model has been designed for class 1A sites.

Url: www.nordex-online.com/en/news-press/news-detail.html?tx_ttnews%5Btt_news%5D=2510&cHash=a5ff706edc

 

< Go Back

Copyright © 2012 World Wind Energy Technology Platform. All rights reserved. Zsquare Kreations